IEE study of Upper Machha Khola Hydropower Project

Introduction

Narrative description of the Project: construction and operation of 4.55MW hydropower project

Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of 4.55MW Upper Machha Khola Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED

Project Duration

Start Date: 12018-09-01
End Date: 2019-07-30
Location: Gorkha
Client: Bikash Hydropower Company Pvt. Ltd.
Status: completed