IEE study of Malta Bagmati Hydropower Project – ESN

Completed

IEE study of Malta Bagmati Hydropower Project

Introduction

Narrative description of the Project:

construction and operation of 8.85MW Malta Bagmati Hydropower Project

Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of Malta Bagmati Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED

Project Duration

Start Date: 2017-08-01
Location: Lalitpur and Makwanpur
Client: Bagmati Water Energy Private Limited
Status: ongoing