IEE study of Giri Khola Mini Hydopower Project – ESN

Completed

IEE study of Giri Khola Mini Hydopower Project

Introduction

Narrative description of the Project:
Jalpa Devi Gramin Shahakri Sanstha Limited proposed implementation of 200KW Giri Khola Mini Hydro project, with the design discharge 0.47 m3/s and 61.1m gross head that will generate 200KW of electric energy. The project consists of headworks with a weir across the river to divert flow, headrace with penstock pipe as a water conveyance system, and surface powerhouse on the left bank of Giri Khola.

Description of Actual Service Provided: Preparation of Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE study of 200 KW Hydoelectric Project in Jumla, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from AEPC and ADB.

Project Duration

Start Date: 2016-03-01
End Date: 2016-07-30
Location: Jumla
Client: Alternative Energy Promotion Center, Nepal
Status: completed