IEE study of G.I. Solar Project – ESN

Completed

IEE study of G.I. Solar Project

Introduction

Narrative description of the Project:

construction and operation of 6.8MW solar project in Morang

Description of Actual Service Provided: Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of 6.8MW solar project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED

Project Duration

Start Date: 2018-08-01
End Date: 2020-04-30
Location: Morang
Client: Sun Urja Pvt. Ltd.
Status: completed