IEE study of Budhum khola Hydropower Project
Introduction
Narrative description of the Project:
construction and operation of hydropower project
Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of Budhum Khola Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED
Project Duration
Start Date: 2019-10-01
Location: Solukhumbu
Client: Arun Valley Hydropower Development Company Limited
Status: ongoing