IEE study for upgrading of Fulbari – Bajhkaderi (Sisneri) road, Arghakhanchi
Introduction
Narrative description of the Project: Upgrading of the road to all weather Double Bituminous Surface Dressing of feeder road
Description of Actual Service Provided: Preparation of Terms of Reference (ToR) and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of ToR for IEE study of Fulbari-Bajhkaderi (Sirseni) Road, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, presentation of the report in the Ministry, (e) incorporation of comments and approval of the report from the concerned government line agencies (Ministry of Physical Infrastructure and Transport Management, MoPITM)