IEE study for construction and operation of office building of Department of Hydrology and Meteorology
Introduction
Narrative description of the Project: construction and operation of office building
Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE report of commercial building (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) preparation of draft and final IEE report of entire projects, (e) incorporation of comments from Ministry of Urban Development
Project Duration
Start Date: 2015-04-01
End Date: 2016-02-28
Location: Kathmandu
Client: Department of Hydrology and Meteorology/Creative Design Architect Pvt. Ltd., Kathmandu
Status: completed