IEE study for 33kV Transmission Line of Rukumgadh Hydropower Project and updated IEE study of Rukumgadh Hydropower Project – ESN

Completed

IEE study for 33kV Transmission Line of Rukumgadh Hydropower Project and updated IEE study of Rukumgadh Hydropower Project

Introduction

Narrative description of the Project:

construction and operation of  5MW Rukumgadh Hydropower Project and 33kV transmission line.

Description of Actual Service Provided: Preparation of Terms of reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of 132kV  Transmission Line  and updated IEE of Rukumgadh Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED

Project Duration

Start Date: 2017-05-01
End Date: 2017-08-30
Location: Rukum
Client: Rapti Hydro and General Construction
Status: completed