EIA study of Upper Madi Zero Hydropower Project

Introduction

Narrative description of the Project:

construction and operation of Upper Madi Zero Hydropower Project (42MW)

Description of Actual Service Provided: Preparation of Scoping Document, Terms of Reference and Report on Environmental Impact Assessment (EIA) study, which includes: (a) Preparation and approval of EIA of Upper Madi Zero Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation and public hearing, (d) Preparation of draft and final EIA report of entire projects, (e) incorporation of comments from DoED and MoFE

Project Duration

Start Date: 2018-11-01
Location: Kaski
Client: Annapurna Power Company Private Limited
Status: ongoing