EIA study of Kasuwa Khola Hydropower Project – ESN

Completed

EIA study of Kasuwa Khola Hydropower Project

Introduction

Narrative description of the Project: construction and operation of 45MW Hydropower Project

Description of Actual Service Provided: Preparation of Report on Scoping Document, Terms of Reference for Environmental Impact Assessment (EIA) study, which includes: (a) Preparation and approval of EIA of 45MW hydropower project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation and Public Hearing, (d) Preparation of draft and final EIA report of entire project, (e) incorporation of comments from DoED and MoFE

Project Duration

Start Date: 2017-03-01
End Date: 2018-10-30
Location: Sankhuwasabha
Client: CEDB Hydro Fund Limited
Status: completed