ESN signed contract agreement with Barah Multi Power Limited for the Supplementary IEE study of Irkhuwa Khola ‘B’ Hydropower Project and 132kV Transmission Line of the same project located in Bhojpur district. contract was signed by Director of Barah Multi Power Limited, Rudra Prasad Dahal and CEO of ESN Mr. Niranjan Shrestha. (July 10, 2018).