IEE study of Soaltee Apartment
ESN has initiated the IEE study of Soaltee Apartment, proposed at Soalteemode of Kathmandu.
ESN has initiated the IEE study of Soaltee Apartment, proposed at Soalteemode of Kathmandu.
IEE study of Apartment Building, proposed in Soalteemode of Kathmandu.
Preparation of Brief Environmental Report for Ganga Diagnostic Centre Pvt. Ltd., located in Panipokhari, Ward No. 3 of Kathmandu Metropolitan. The centre will provide the diagnostic services to patients through MRI and USG machines.
ESN prepared Brief Environmental Report for Ganga Diagnostic Centre Pvt. Ltd., located in Panipokhari, Ward No. 3 of Kathmandu Metropolitan. The centre will provide the diagnostic services to patients through MRI and USG machines. (September 27, 2020)
Environmental Services Nepal (ESN) signed Contract agreement with Api Power Company Limited for the Initial Environmental Examination (IEE) study of 132kV Transmission Line of Upper Chameliya Hydropower Project. The agreement was signed by Sanjeev Neupane, MD of Api Power and Read More
Fiscal Year 2076/077 became significant to ESN in conservation sector as it completed numbers of assignments related to conservation, which are: Documentation of best practices and success stories of ITHCP project and related activities of human wildlife conflict and income Read More
Environmental Services Nepal (ESN) signed Contract agreement with Sun Urja Nepal Pvt. Ltd. for the Initial Environmental Examination (IEE) study of 6 MWp Solar PV Project and 1.5 km Transmission Line located in Bardiya district. The agreement was signed by Read More
The Daraundi-New Marsyangdi 132kV Joint Transmission Line Project shall establish a common optimal line to evacuate power from the HPPs being developed/planned by various IPPs to the New Marsyangdi substation of National Grid hence reducing the technical losses, improving line Read More