IEE report of Fulbari-Sirseni road got approved
Initial Environmental Examination (IEE) report submitted to Ministry of Physical Infrastructure and Transport Management got approved recently, December 1, 2014.
Initial Environmental Examination (IEE) report submitted to Ministry of Physical Infrastructure and Transport Management got approved recently, December 1, 2014.
Data entry and preparation of Water Use Master Plan (WUMP) for Chamunda and Naule Katuwal VDC of Dailekh district is finalized and submitted to WARMP. Environmentalist/Engineer: Sadikshya Basnet and Bharat Mani Paudel involved in data entry and Mr. Paudel prepared Read More
Environmental Services Nepal private Limited (ESN) has successfully completed two years of the establishment and entered into fourth year. ESN would like to express gratude to all ESN employees and consultants for their untiring efforts to bring ESN to this Read More
Consulting Service Contract Agreement was signed with Water Resources Management Programme (WARM-P)/HELVETAS Swiss Intercooperation Nepal to prepare Water Use Master Plan (WUMP) report of two VDCs named Chamunda and Naule Katuwal from Dailekh District. The contract was signed by Madan Read More
IEE report of Siraha-Madar road in Siraha DDC is approved by Ministry of Federal Affairs and Local Development. (June, 2013)
IEE study for Kathmandu Sustainable Urban Transport Project is ongoing and the report is being completed soon. The project includes the construction of two motorable bridges over Bishnumati River at Teku and Shovabhagawati, one pedestrian bridge near Bhimsensthan and improvement Read More
ToR for IEE study of nine RIP (Road Improvement Project being implemented by Departments of Roads) road projects is approved by Ministry of Physical Infrastructure and Transport (MoPIT). The roads are upgrading of Balkhu-Daksinkali Road, Balaju-Ranipauwa-Trishuli Road, Trishuli-Chhahare Road, Nuwakot, Read More
Permission is obtained from Minsitry of Forest and Soil Conservation (MoFSC) to conduct EIA study for 132KV transmission line of Lower Khare Khola Hydropower Project. Which is located in Gaurishankar Conservation Area in Dolakha district.(July 5, 2013) Similarly, permission for Read More
Draft IEE report of Fulbari-Sirseni-Road is submitted to Geo-Environmental and Social Section of Department of Roads. (July 3, 2013)