IEE study of Siddhababa Tunnel Project, Palpa
Introduction
Description of Actual Service Provided: Preparation of Terms of Reference and report for IEE study, which includes: (a) Preparation and approval of IEE of (1.126km) Siddhababa Tunnel project, Palpa (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation and Public Hearing, (d) Preparation of draft and final IEE report of entire project, (e) incorporation of comments from MoPIT
Project Duration
Start Date: 2022-04-18
End Date: 2023-07-15
Location: Tinau RM-3, Palpa
Client: China State Construction Engineering Corporation Limited (CSCEC)