SEIA of Sanghu Khola hydro, IEE of 132kV TL and two 33kV TL Projects
Introduction
- Supplementary EIA study of Sanghu Khola Hydropower Project (24MW)
- IEE study of 132kV Transmission Line of Sanghu Khola Hydropower Project
- IEE study of 33kV TL of Mathillo Suri Khola Hydropower Project and
- IEE study of 33kV TL of Sanghu Khola-1 Hydropower Project, Dolakha
Project Duration
Start Date: 2021-03-03
Location: Dolakha
Client: Him Parbat Hydropower Private Limited
Status: ongoing