SIEE of Irkhuwa Khola ‘B’ Hydropower Project and IEE of 132kV Transmission Line of the same project
Introduction
Narrative description of the Project: construction and operation of hydropower project and transmission line
Description of Actual Service Provided: Description of Actual Service Provided: Preparation of Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of SIEE of Irkhuwa Khola ‘B’ Hydropower Project and IEE of 132Kv Transmission Line, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED
Project Duration
Start Date: 2018-10-01
Location: Bhojpur
Client: Barah Multipower Pvt. Ltd.
Status: ongoing