EIA study of Chomorong Khola Hydropower Project
Introduction
Narrative description of the Project:
construction and operation of Chomorong Khola Hydropower Project
Description of Actual Service Provided: Preparation of Scoping Document, Terms of Reference and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of EIA of Chomorong Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation and public hearing, (d) Preparation of draft and final EIA report of entire projects, (e) incorporation of comments from DoED and MoFE
Project Duration
Start Date: 2018-03-01
Location: Kaski
Client: Ghandruk Hydro Private Limited
Status: ongoing