EIA study of Upper Chameliya Hydropower Project
Introduction
Narrative description of the Project:
construction and operation of 40MW Hydropower Project
Description of Actual Service Provided: Preparation of Scoping Document, Terms of Reference and report for Environmental Impact Assessment (EIA) study, which includes: (a) Preparation and approval of EIA of 40MW hydropower project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation and Public Hearing, (d) Preparation of draft and final EIA report of entire project, (e) incorporation of comments from DoED and MoFE
Project Duration
Start Date: 2016-01-01
End Date: 2018-03-30
Location: Darchula
Client: Api Power Company Limited
Status: completed