ToR preparation for IEE study for 132kV Transmission Line of Dordi-1 Hydropower Project
Introduction
Narrative description of the Project:
construction and operation of 132kV transmission line of 10.3MW Dordi-1 Hydropower Project
Description of Actual Service Provided: Preparation of Terms of Reference for Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE ToR of 132kV Transmission Line of Dordi-1 Hydropower Project, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE ToR, (e) incorporation of comments from DoED
Project Duration
Start Date: 2017-06-01
End Date: 2017-09-30
Location: Lamjung
Client: Dordi Khola Hydropower Company
Status: completed