IEE study of Marsyangdi Corridor (Udipur-Bharatpur) 220kV Transmission line Project – ESN

Completed

IEE study of Marsyangdi Corridor (Udipur-Bharatpur) 220kV Transmission line Project

Introduction

Narrative description of the Project: construction and operation of 64.75km long 220kV transmission line passing through Lamjung, Gorkha, Tanahu, Chitwan districts

Description of Actual Service Provided: Preparation of Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of IEE of 220kV Transmission Line, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments from DoED

Project Duration

Start Date: 2016-09-01
End Date: 2017-09-30
Location: Lamjung, Gorkha, Tanahu, Chitwan districts
Client: Nepal Electricity Authority
Status: completed