Supplementary IEE study of Lower Khare Khola Hydropower Project
Introduction
Narrative description of the Project: Lower Khare Khola Hydropower Project (11MW) located in Suri VDC of Dolakha district.
Description of Actual Service Provided: Preparation of Terms of Reference (ToR) and Report on Initial Environmental Examination (IEE) study, which includes: (a) Preparation and approval of ToR for IEE study of 11MW Lower Khare Khola Hydropower Project in Dolakha, (b) baseline data collection of biophysical, socio-economic as well as cultural environment, (c) public consultation, (d) Preparation of draft and final IEE report of entire projects, (e) incorporation of comments and approval of the report from the concerned government line agencies (Ministry of Energy)
Project Duration
Start Date: 2013-02-01
End Date: 2013-05-30
Location: Dolakha
Client: Universal Power Company Limited
Status: completed